Overview
This file documents all known issues, risks, and blockers identified in the handover material. Understanding these early will help you avoid surprises.
Issue 1 — Database Schema Inconsistency
What the Problem Is
Existing customer databases have drifted from the official ESP schema. The dacpac built by Team Ludo reflects what the schema should be, but what's actually in customer databases doesn't match.
Impact
- The dacpac cannot be used against any customer database until that database is manually aligned
- Deploying a dacpac against a mismatched DB risks data corruption or failures
What Needs to Happen
For each customer database:
- A DBA or developer inspects the actual DB schema
- Identifies differences from the dacpac's expected schema
- Writes and applies manual scripts to bring the DB into line
- Verifies a trial dacpac deployment succeeds against a copy
- Marks the manifest
dacpacReady: true
Mitigations in the Pipeline
- The pipeline must check the
dacpacReadyflag before touching the database - If
false, fail immediately with a clear error message - See ESP Database for implementation detail
Issue 2 — Build Artifact Is a Flat DLL Dump
What the Problem Is
The ESP Main Build pipeline produces a single large flat folder containing all DLLs for all applications mixed together. There is no clear separation like:
/artifacts/DLService/DLService.dll
/artifacts/EmailService/EmailService.dll
Instead it's more like:
/artifacts/DLService.dll
/artifacts/SomeSharedLibrary.dll
/artifacts/EmailService.dll
/artifacts/AnotherThing.dll
... (hundreds of files)
Impact
- The PREDEPLOY stage can't simply copy a folder to a service's install path
- Scripts will need to know which DLLs belong to which application
- This mapping does not yet exist
What Needs to Happen
- Investigate the build artifact structure in detail
- Create a mapping: application → list of DLLs/files it needs
- This mapping may need to be stored in the scripts, the manifest, or a separate config file
- Ideally, feed back to the build team to separate the artifacts properly
Issue 3 — No Test Environment
What the Problem Is
There is no dedicated sandbox environment to run test deployments against. Any deployment the team runs is against a real customer environment.
Impact
- Mistakes affect real customers
- You cannot safely iterate and test the pipeline without risk
- Developing and debugging deployment logic is much harder
What Needs to Happen
- Set up a dedicated ESP test environment (raised as TBC in handover)
- This may require ESS to provision a server, or Microlise to build one
- Until then, exercise extreme caution with any deployment run
Issue 4 — Licensing Prevents Local Execution
What the Problem Is
ESP cannot be run on developer machines due to licensing restrictions.
Impact
- You cannot test your deployment scripts against a local ESP instance
- Debugging requires deploying to a real (or test) server
- Makes the development feedback loop longer
Mitigation
- The three-tier architecture helps here: Tier 3 functions can be unit tested in isolation without a real ESP environment
- Use Pester (PowerShell testing framework) for unit tests
- End-to-end testing requires access to a real environment
Issue 5 — Cycle Checks Require Citrix UI Navigation
What the Problem Is
Post-deployment validation ("cycle checks") involves navigating through the Citrix application UI to verify functionality. This is:
- Extensive and time-consuming
- Very hard to automate (requires UI automation tooling like Selenium or Tosca)
- Dependent on Citrix being accessible from the test runner
Short-Term Mitigation
Implement cycle checks as a manual prompt in the POSTDEPLOY stage — the pipeline pauses and waits for a human to confirm the checks passed.
Long-Term Options
- Investigate API-level checks if ESP exposes any (bypasses UI entirely)
- UI automation tools (e.g. Ranorex, Tosca, Selenium with Citrix plugin)
- Simplified smoke tests that don't require full UI navigation
Issue 6 — Citrix Upgrade Mechanism Unknown
What the Problem Is
The exact technical mechanism for upgrading a Citrix-delivered application is not yet confirmed. The working assumption is that it involves:
- Copying files to the Citrix server
- Handling any locked executable (the running app may lock its own
.exe)
What Needs to Happen
- Confirm with ESS or Citrix documentation how Citrix app upgrades work
- Determine if there's a Citrix-native method (e.g. App Layering, PVS updates) vs. a simple file swap
- Understand how to handle sessions that lock the executable
Issue 7 — Test/Prod on Same Server
What the Problem Is
Some customers may have their TEST and PROD instances on the same physical server, differentiated only by install path or port.
Impact
A misconfigured manifest or script bug could cause a PROD deployment when a TEST deployment was intended.
Mitigations
- The manifest must clearly separate TEST and PROD config even if they share a server
- Consider an explicit confirmation prompt when deploying to PROD
- AzDO approval gates for PROD stages (not yet designed)
- The VALIDATE stage should catch obvious misconfigurations
Risk Register Summary
| # | Issue | Severity | Status | Mitigation |
|---|---|---|---|---|
| 1 | DB schema inconsistency | High | Unresolved | dacpacReady flag, manual DB fix first |
| 2 | Flat DLL artifact | Medium | Unresolved | Needs DLL-to-app mapping |
| 3 | No test environment | High | TBC | Treat all runs as live |
| 4 | No local execution | Medium | Inherent | Unit test Tier 3 with Pester |
| 5 | Cycle checks need UI | Medium | Manual short-term | Automate later; manual prompt now |
| 6 | Citrix upgrade mechanism unknown | Medium | TBC | Investigate with ESS |
| 7 | Test/Prod on same server | Medium | Design needed | Manifest separation, approval gates |